E-LD2000 Vertical Glass Washing and Drying Machine
Can wash LOW-E Glass/Multi-coated glass
Technical parameters
Working size |
1800*2500mm |
Washing thickness |
3-12 mm |
Brusher |
6 pcs |
Hot knife |
1 pair |
Sponge roller |
1 pair |
Total power |
22kw |
Feeding section |
2500*700*2200mm(Length*Width*Height) |
Washing and Drying section |
2200*1200*2900mm(L*W*H) |
Outlet section |
2800*700*2200mm(L*W*H) |
Features
- It is painted by an electrostatic paint for protection against a rust and scratchs.
- Conic moving gears are made from a special steel alloy.
- Nuts corrosion-proof, apertures for nuts aluminium.
- A working direction of action with left on the right party.
- Brushes from above and from below have adjustment for approach.
- The electro system corresponds to safety rules.
- Heating up plates and water tank from stainless steel.
- Special brushes for reflecting glasses.
- Adjustment of speed of a running tape.
- Covers stainless steel windows.
- LOW-E option
- Power: 380V 50HZ 3 phase or 3 Phase,220v ,60hz
- CE CERTIFICATE for European Union
Details
1.Question:Are you manufacture?
Answer: Yes,we are professional manufacture which have more than 5 workshops.
2.Question: How about the service?
Answer:
1.Reply it within 12 hours if it from Ali-trademanager or email .
2.Deliver max within 15 days.
3.24 hours for after -sale service.
4.More than 12 years experience in this kind machine field.
5.Fluent English ,communication barrier free.
3.Question:What's the guarantee?
Answer:
1.Our guarantee is 18 months.
2.24 hour's technical support by email or calling.
3.English manual and video tutorial.
4.2 years quality guaranty for the machine (excluding the consumables).
5.We will provide the consumable parts at an agency price.
6.24 hours on line service each day, free technical support.
4.Q: Do you provide equipment operation training?
Answer:
Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training.
All of our engineers have passport.
5.Question:if our price is higher than another company or factories?
Answer: Please check the different of the machine parts ,service and guarantee,especially the machine inner electric parts, sometimes, if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reliable parts for the machines inside.
6.Question:How long is the delivery time?
Answer: For standard machines, it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.
7.Question: What is the payment?
Answer: Any payment method you want,such as L/C,T/T,D/P,West-union and so on.
Send your message to this supplier.