It's mainly used for bending iron, copper profile, aluminum profile or special-shaped profile etc. It adopt automatic CNC systems and can satisfy all kinds of profile on bending the arc and curvilinear connection.
Technical Parameter
Power supply |
380V 50Hz (3-phase,4 wires) |
Motor power |
6 kw |
Max. Bending width |
150mm |
min bending arc diameter |
230 |
Roller rotating speed |
1-8 r/min |
roller mould max diameter |
180mm |
top roller traveling |
200mm |
overal dimension(L×W×H) |
1500*1200*1450mm |
hydraulic push pressure |
180 KN |
top roller positioning precision |
0.02mm |
Q: Are you manufacture?
A: Yes, we are the professional manufacture which have more than 5 workshops.
Q: How about the service?
A: 1).Reply it at once if from Ali-trade manager if by email,it reply it within 12 hour
2).Deliver max.days within 15 days
3).24 hours for after-sale service
4).More than 12 years experience in this kind machine field
5).Fluent English,communication barrier free
Q: What's the guarantee ?
A: 1).Our guarantee for 18 months.
2).24 hour's technical support by email or calling
3).English manual and video tutorial
4).2 year quality guaranty for the machine(excluding the consumables)
5).We will provide the consumable parts at an agency price
6).24 hours on line service each day,free technical support
Q: Do you provide equipment operation training?
A: Yes.We can send professional engineers to the working site for equipment installation,adjustment,and operation training. All of our engineers have passport.
Q: If our price is higher than another company or factories ?
A: Please check what is the different of the machine parts service and guarantee,especially the machine inner electric parts.Sometimes,if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reiable parts for the machines inside.
Q: How long is the delivery time ?
A: For standard machines,it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.
Q: What is the payment?
A: Any payment method you want, such as L/C,T/T,D/P,West-Union and so on.